Hub360 — Construction Delivery Verification
Proof of delivery for construction materials and waste.
Stop paying for loads that can't be proven. Get GPS, photo and time-stamped proof for every truck, every material, every time.
Watch Hub360 in action
See how one verified construction movement is captured.
Watch how Hub360 creates GPS, photo and time-stamped proof for construction deliveries, material movements and waste records — from the field app to the exportable proof pack.
Hub360 delivery verification demo
GPS, photos, timestamps and digital proof packs for construction movements.
What Hub360 does
One digital record for every construction movement.
Hub360 replaces paper dockets with GPS, photo and time-stamped proof for aggregates, muck-away, concrete, asphalt, waste and construction deliveries.
Capture
Drivers and site teams create verified records directly from the field.
- GPS location at lift and drop
- Time-stamped collection and delivery
- Photos and signatures
- Vehicle, load and site details
Verify
QS and finance teams can review evidence before approving invoices.
- Reduce missing dockets
- Spot unsupported claims
- Track movements in real time
- Create full audit visibility
Export
Create structured evidence packs for valuation, audit and compliance.
- PDF, CSV and Excel exports
- QS valuation packs
- Waste traceability records
- DWTS-ready workflows
Who uses Hub360?
Built for the people carrying the commercial and audit risk.
Developers, QS teams, contractors, quarry operators, hauliers and waste operators use Hub360 to replace paper dockets with verified digital proof.
How it works
Captured in the field. Verified in real time.
Drivers and site teams capture the movement. QS and commercial teams review and export the proof.
Drivers or site teams create the digital record at collection, delivery or tipping.
GPS, timestamps, signatures and photos are linked to every movement.
Create digital proof packs for QS sign-off, audit, disputes and compliance.
Concrete delivery verification
Record what happened during the pour — not after the dispute.
Hub360 captures concrete delivery events including arrival on site, idle time, pour start, washout and authorised water additions.
Next step
See what proof looks like on your project.
We’ll walk through your current delivery or waste workflow and show how Hub360 captures GPS, photo and time-stamped proof for every movement.